April's 'work detail' centered around finding the original sight of the outdoor shower and the walkway buried in sand. We replumbed the supply lines, propped up some trellis' to define the space and began the planning for the walkway reconstruction. Other items addressed: interior light fixtures, wall repair, pictures, cabinet trim, shower fixture, and a "sink skirt" (i'll post a pic in the next entry).
No comments:
Post a Comment